News

Next to Prime Pump, he’s one of WANGEN effluent pumps’ biggest fans.

Davieth Verheij, Managing Director of AgFirst Engineering, Waikato was so impressed by German designed and manufactured WANGEN pumps he had even considered bringing them into New Zealand himself.

“I first saw WANGEN pumps on farms and biogas plants during my 2014 trip to the UK, Italy, Holland and Germany. Then I saw them again in Italy, Holland, Germany and Denmark in 2015. I was quite surprised to see them installed throughout Italy at the biogas plants I visited, given that the Italians manufacture their own progressive cavity pumps and typically proudly use Italian-made products.

“WANGEN really stood out massively on the world stage.

“By the time I visited WANGEN PUMPEN on their stand at the Agritechnica show in Hanover in 2015 and met Prime Pump’s Ben Petrie, I’d already begun looking into importing the pumps myself. But we had a lot of project work on, and it’s not really our game. I decided to work with Prime Pump instead; after all, that’s what they do best!”

Today, WANGEN pumps account for around 90% of the installs for AgFirst Engineering.

The head of the specialist dairy effluent and water management company,

Davieth has been in the game for almost two decades. “I started on the tools installing water and effluent systems on dairy farms when I was 17. I’ve come to this from the ground up.”

He says he initially worked for a large company with a lot of clients many of whom, at the time, were not effluent management compliant. “Back then, there wasn’t really a lot of information about efficient effluent management. I stepped up to the challenge of sorting effluent systems and focussing on system design and build.”

Davieth studied, and achieved industry accreditation. Nine years ago, that lead him to starting AgFirst Engineering, Waikato, a division of AgFirst, New Zealand’s largest agricultural and horticultural consultancy network.

AgFirst Engineering, Waikato provides sought after  “whoa to go” solutions for dairy farms throughout New Zealand but particularly in Waikato and to the burgeoning Taranaki dairy industry. “We’re one of the few companies which does the effluent management design, manufactures the equipment, completes installation work, manages the contractors – the whole thing,” Davieth says.

In the company’s early years in Waikato, work was mostly new dairy effluent systems. “Over the last five years, it’s been upgrades, extensions or improvements; removing the original pump and replacing it with Wangen – there’s been a lot of that.”

Most recently, the company has been a part of the boom in Taranaki. “It’s been about half of our business.” Currently there are around 25 systems in production.
Systems are designed by AgFirst Engineering and manufactured as kitsets before installation in the region by a local company, Coastal Agri Services.

“It’s a classic example of word of mouth with farmers. They all talk to each other and when one does it, so do all the others.”

Prior to installing WANGEN pumps, AgFirst Engineering had used progressive cavity pumps which Davieth said had been “fine”. “But once we reached the service cycle – we started seeing the wear and tear and problems that were there with the stators and drive shaft. Going back to repair or replace them after about eight years was not good enough for us. When you compared them to the lifetime benefits of WANGEN, it was a no brainer.

“We’ve been installing WANGEN for four years and other than minor start-up glitches, we haven’t been back to one yet.”

“They’re running as low as half the speed and everything’s just bigger. And you’ve got the durable Cardan universal joint. They’re indestructible from what I can see, and there’s significantly less maintenance cost.”

A critical design feature, the Cardan’s knuckle-like system is superior to the conventional pin joint. While the pin joint wears, often rapidly, resulting in characteristic “sloppiness” and ultimately the need for replacement the Cardan joint operates smoothly and seamlessly, lasting the lifetime of the pump. The design, which has the same diameter as the rotor ahead also avoids constraint in the flow, and the problem of settling, which effectively removes the issues related to fibres becoming wrapped around the shaft.

A one-piece cartridge mechanical seal, filled with oil, rather than a two-piece system, is also far easier and quicker to fit while the oil, again, helps extend the life of the pump. (There are well documented European examples of WANGEN pumps running for three decades without the need for intervention.)

As the positive displacement system has no slippage, it produces more pressure from the same flow as competing pumps.

Davieth says the WANGEN pumps have also delivered quantifiable performance advantages over other pumps. “You get a constant flow of effluent across a property which makes it easier to calculate how much nutrient is going where.”

The option of 7.5kW to 18.5kW also give clients options that suit their management system, the flow, the size of the farm, and other factors which need to be built in, including the rainfall. “We have also had multiple pumps custom designed to achieve large head pressures – up to 160m.”

The pumps can also handle very heavy solids. “I’ve never had a blockage with a WANGEN pump. Blockages are just not a problem”

Trusted by:


City Care Fonterra Bathhurst Connell CPB HEB Transmission NCTIR Grey District Council McConnell March Waste Management Westland Milk Products